Eugene, OR
$42 Million
EC was one of the first subcontractors on site designing and laying out power distribution for this world-famous track and field arena. Underground scope included power and lighting for locker rooms, classrooms, training, and an indoor practice track. Above ground scope featured power distribution, lighting, audiovisual, and wireless communications. Electrical construction required 72 miles of conduit, 200 miles of wire and cable, and 16,000 LED’s wrapping Hayward Tower.