Project Profile | Mission Critical

PGE Integrated Operations Center (IOC)

LOCATION:

Sherwood, OR

CONTRACT VALUE:

$31 Million

This state-of-the-art facility centralizes PGE’s mission critical regional utility operations. EC built out all electrical systems, controls, and security. PGE IOC required design and construction of several redundant power configurations including battery, flywheel, and backup power generation for 14 days of emergency power capability. Utility power was brought in through flexible cabling that allows the building to float on its base through a 9.0 seismic event without losing power.