Oregon-Washington Border
$600k
EC’s service team relocated electrical power to make way for a crane to replace the cracked trunnion wheel at the top of this drawbridge’s North tower. This scope was completed while the bridge remained operational with more 150,000 vehicles crossing per day.
Copyright © 2024 EC Electric | All Rights Reserved | Web Design By Skyway.Media